Sign in Subscribe

Conservation Commission approves erosion control project

Conservation Commission · Meeting of March 2, 2026

Southwick Conservation Commission approves erosion control project at South Longyard Road. The commission unanimously backed a Department of Public Works proposal to extend a piped storm drainage network to address chronic erosion, which will disturb 4,750 square feet of Riverfront Area and require removal of 12 to 15 mature trees. DPW Assistant Director Jon Goddard and Director Rich Bosak said the plan aims to prevent future erosion for the foreseeable future.

In the full story:

  • The complete report — 469 words

Source: the Conservation Commission meeting of March 2, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Southwick News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Southwick News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe